Bid guide

How to bid on ANC Gates N1 and C3 Passenger Boarding Bridge Replacements Design-Build for the State of Alaska

State of Alaska AKCloses August 14, 2026

What the agency is buying

The State of Alaska Department of Transportation and Public Facilities is looking for a design-build contractor. This project involves replacing passenger boarding bridges at Gates N1 and C3 of the Ted Stevens Anchorage International Airport (ANC).

This is an opportunity for firms specializing in airport infrastructure and design-build projects to work with the State of Alaska on a significant upgrade to airport facilities.

Key dates and deadlines

The solicitation was published on July 23, 2026. The deadline for proposals is August 14, 2026, at 3:59 AM ET. All proposals must be submitted by this time.

It is crucial to submit your response well before the deadline to avoid any last-minute technical issues.

Who this opportunity suits

This opportunity is suitable for construction firms with expertise in design-build projects, particularly those with experience in airport infrastructure or passenger boarding bridge replacement. Companies with a strong background in civil engineering and construction management for aviation facilities would be well-suited.

The project falls under the construction category, specifically for airport improvements.

How to respond

To access the solicitation, you need to view the original source on Alaska’s Online Public Notices. The posting and its associated documents are publicly available, and you do not need an account to view them.

You must respond exactly as specified in the notice. Alaska does not use a central e-bidding system, so pay close attention to the submission instructions provided in the solicitation documents before the August 14, 2026 deadline.

Practical tips for preparing a competitive response

For a design-build project like this, emphasize your firm's integrated approach to both design and construction. Highlight past projects where your team successfully managed both aspects, especially those with similar scope or complexity.

Clearly articulate your understanding of airport operational requirements and how your proposed solution will minimize disruption during the replacement process. Provide detailed information on your team's qualifications, including key personnel's experience with passenger boarding bridges and airport environments. Ensure your proposal addresses all technical specifications and requirements outlined in the solicitation documents.

See the live bid — deadline, agency details, and how to respond

Dates and requirements can change via addenda; always verify on the bid page and at the original source before responding.

View this bid on BiddingSimple

This guide was prepared by BiddingSimple from the solicitation’s public posting. It is not official guidance from State of Alaska; the original posting controls.