What the agency is buying
The State of Connecticut, through DAS Procurement, is seeking a contractor for the 777 Pump Station Improvement Project. This project involves replacing and upgrading the existing 777 pump station.
The work includes installing a new turnkey packaged pump station with a valve pit, demolishing existing structures, dewatering, and setting up a temporary sewer bypass. The project also requires removing an existing propane tank and generator, then installing a new diesel generator. Additionally, an oversized manhole inlet will be retrofitted with a grinder. Rock removal is not expected as part of this project.
Key dates and deadlines
This Invitation to Bid (IFB) was published on July 29, 2026. All responses must be submitted by the deadline of September 11, 2026, at 11:00 AM ET. Responses submitted after this time will not be considered.
Who this opportunity suits
This opportunity is suitable for construction firms with experience in pump station installation, demolition, dewatering, temporary sewer bypass systems, and generator installation. Companies specializing in infrastructure upgrades and utility work, particularly those familiar with packaged pump station systems, will find this relevant. The project falls under the construction category.
How to respond
To access the full solicitation documents and respond, you need to go to CTsource, Connecticut's statewide procurement portal. The bid is posted as Invitation to Bid 38233.
You can view the bid details publicly without an account. However, to download documents or submit your response, you will need a free CTsource account. Ensure you complete your submission before the September 11, 2026, 11:00 AM ET deadline.
Tips for a competitive response
When preparing your bid, carefully review all specifications related to the turnkey packaged pump station, valve pit, and associated appurtenances. Provide clear details on your proposed methods for demolition, dewatering, and the temporary sewer bypass. Highlight your experience with similar projects, especially those involving generator installation and grinder retrofits.
Pay close attention to the scope of work, ensuring your proposal addresses all components, including the removal of existing structures and the installation of new equipment. Since rock removal is not anticipated, focus your cost estimates and project plan on the specified tasks. Double-check all required forms and ensure your submission is complete and accurate before the deadline.
See the live bid — deadline, agency details, and how to respond
Dates and requirements can change via addenda; always verify on the bid page and at the original source before responding.
View this bid on BiddingSimpleThis guide was prepared by BiddingSimple from the solicitation’s public posting. It is not official guidance from State of CT - DAS Procurement; the original posting controls.