In plain English
Pennsylvania Department of Transportation is seeking bids to mill, patch and resurface 12.93 miles of SR 15 in Adams County, across Straban, Butler, Tyrone and Huntington townships. The project cost range is $10 million to $12.5 million, and work must be completed by November 1, 2027. Only prequalified bidders may submit bids electronically through ECMS; bids are due December 10, 2026, at 11:00 a.m. Eastern.
About this bid
This project consists of milling, concrete patching, resurfacing, and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 0015, SECTIONS 062/RDP, in ADAMS COUNTY, STRABAN, BUTLER, TYRONE, & HUNTINGTON TOWNSHIPS, from Segment 0270/0271 Offset 2695/2935 to Segment 0430 Offset 1095, for an overall project length of 68,272.00 linear feet (12.93 miles). ECMS project 124064, bid package 1 (Standard). Short description: Rt 15 North Paving. County: Adams. Municipality: Huntington. SR 15, section 062. PennDOT District 08. Type of work: Resurfacing/overlays. Project cost range: $10,000,000.00 - $12,499,999.99. Federal project status:…
Details
- Classification (PSC)
- Highway construction — Resurfacing/overlays
- Place of performance
- Huntington, Pennsylvania
How to access this bid
Click “View the original posting” — it opens this bid package in PennDOT's ECMS.
If ECMS shows its home page instead, click the link to enter ECMS as a guest (no account needed) and open the link again — or use Search › Bid Packages and look up the project number shown above.
The bid package lists the plans, special provisions, items, addenda and questions and answers. Bidding needs PennDOT prequalification and an ECMS business partner account; bids are submitted electronically before the let time (US Eastern).

