In plain English
PennDOT seeks a prequalified contractor to resurface SR 957 from Miller Hill Road to State Route 62 in Farmington Township, Warren County. Work includes guiderail, seeding, pollution control, signage, and pavement markings. The estimated project cost is $1 million to $2.5 million, with completion required by May 5, 2028. Bids are due electronically through ECMS on December 10, 2026, at 11:00 a.m. Eastern; there is no pre-bid meeting.
About this bid
This project includes resurfacing, guiderail, seeding, pollution control, signage, and pavement marking of State Route 0957 from APPROXIMATELY Segment 0380 offset 2795' to APPROXIMATELY segment 0500 offset 3133' in Farmington Township, Warren County. ECMS project 117658, bid package 1 (Standard). Short description: SR 957: Miller Hill Road to State Route 62. County: Warren. Municipality: Farmington. SR 957, section 671. PennDOT District 01. Type of work: Resurfacing/overlays. Project cost range: $1,000,000.00 - $2,499,999.99. Federal project status: Non - Federal (100% State). Pre-bid meeting: None. Required completion: 05/05/2028. This is an ECMS project. All Addenda will be electronically…
Details
- Classification (PSC)
- Highway construction — Resurfacing/overlays
- Place of performance
- Farmington, Pennsylvania
How to access this bid
Click “View the original posting” — it opens this bid package in PennDOT's ECMS.
If ECMS shows its home page instead, click the link to enter ECMS as a guest (no account needed) and open the link again — or use Search › Bid Packages and look up the project number shown above.
The bid package lists the plans, special provisions, items, addenda and questions and answers. Bidding needs PennDOT prequalification and an ECMS business partner account; bids are submitted electronically before the let time (US Eastern).
New to this kind of bid?
Read the plain-English guide: what the agency wants, the key dates, and how to put together a competitive response.

