In plain English
PennDOT is seeking a prequalified bidder for a partial design-build replacement of the Pennsylvania Avenue Bridge over the Delaware Canal in Morrisville Borough, Bucks County. The work also includes miscellaneous construction and ADA curb ramp design. The project cost range is $5 million to $7.5 million, and bids are due electronically through ECMS by December 10, 2026, at 11:00 a.m. Required completion is October 4, 2029.
About this bid
This partial design/build project is for the replacement of the Pennsylvania Avenue Bridge over Delaware Canal and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 2073, SECTION BPA, in BUCKS COUNTY, MORRISVILLE BOROUGH from approximately 212 feet west of Hillcrest Avenue at segment 0070 offset 1115 to approximately 260 feet east of Union Street at segment 0070 offset 0400. ECMS project 84258, bid package 1 (Standard). Short description: Pennsylvania Avenue over Delaware Canal (Design Activities Limited to ADA curb ramps). County: Bucks. Municipality: Morrisville. SR 2073, section BPA. PennDOT District 06. Type of work:…
Details
- Classification (PSC)
- Highway construction — Bridge replacement
- Place of performance
- Morrisville, Pennsylvania
How to access this bid
Click “View the original posting” — it opens this bid package in PennDOT's ECMS.
If ECMS shows its home page instead, click the link to enter ECMS as a guest (no account needed) and open the link again — or use Search › Bid Packages and look up the project number shown above.
The bid package lists the plans, special provisions, items, addenda and questions and answers. Bidding needs PennDOT prequalification and an ECMS business partner account; bids are submitted electronically before the let time (US Eastern).
New to this kind of bid?
Read the plain-English guide: what the agency wants, the key dates, and how to put together a competitive response.

