In plain English
PennDOT is seeking a prequalified contractor for drainage and roadway improvements on SR 2003 in Union and Vernon Townships, Crawford County. Work includes replacing a 72-inch corrugated metal pipe with an 84-inch reinforced concrete pipe, reconstructing asphalt roadway, and improving guide rails and pavement markings. The project is estimated at $200,000–$499,999, with completion required by June 21, 2027. Bids are due electronically through ECMS on December 10, 2026, at 11:00 a.m. Eastern.
About this bid
This project is the construction of State Route 2003 over an unnamed tributary to Van Horne Creek in Union and Vernon Townships, Crawford County, with an approximate length of 0.057 mile from SR 2003/Segment 0120/Offset 1977 to SR 2003/Segment 0130/Offset 0183, including replacing a 72" Corrugated Metal Pipe with an 84" Reinforced Concrete Pipe, asphalt roadway reconstruction, guide rail improvements, delineation, and waterborne pavement markings, as indicated on the approved drawings included in the Bid Package. ECMS project 123058, bid package 1 (Standard). Short description: Deep Pipe Replacement Project. County: Crawford. Municipality: Union. SR 2003, section DP1. PennDOT District 01.…
Details
- Classification (PSC)
- Highway construction — Drainage improvement
- Place of performance
- Union, Pennsylvania
How to access this bid
Click “View the original posting” — it opens this bid package in PennDOT's ECMS.
If ECMS shows its home page instead, click the link to enter ECMS as a guest (no account needed) and open the link again — or use Search › Bid Packages and look up the project number shown above.
The bid package lists the plans, special provisions, items, addenda and questions and answers. Bidding needs PennDOT prequalification and an ECMS business partner account; bids are submitted electronically before the let time (US Eastern).
New to this kind of bid?
Read the plain-English guide: what the agency wants, the key dates, and how to put together a competitive response.

