PennDOT is seeking bids for a bridge rehabilitation bundle covering four bridges in Columbia and Montour counties, including deck and superstructure work, roadway approaches, guide rail, sidewalks, and curbs. The project cost range is $1 million to $2.5 million, with completion required by September 27, 2028. Bids are due electronically through ECMS on December 10, 2026, at 11:00 a.m.; bidders must be PennDOT-prequalified.
About this bid
The description and location of the project are as follows: Includes two bridge rehabilitations of a non-composite asphalt overlay with a composite concrete deck, two bridge superstructure rehabilitations on existing abutments, roadway approaches, guide rail, sidewalk, curb, and other miscellaneous construction, as indicated on the approved drawings included in the bid package for the SEDA-COG BRIDGE REHABILITATION Project in COLUMBIA AND MONTOUR COUNTIES GREEWNWOOD TOWNSHIP, SUGARLOAF TOWNSHIP, STILLWATER BOROUGH, AND DANVILLE BOROUGH, Paperdale Road site is approximately 0.4 miles EAST of intersection with Lower Raven Creek Road to approximately 1.2 miles WEST of intersection with Buck…
Details
- Classification (PSC)
- Highway construction — Bridge
- Place of performance
- Greenwood, Pennsylvania
How to access this bid
Click “View the original posting” — it opens this bid package in PennDOT's ECMS.
If ECMS shows its home page instead, click the link to enter ECMS as a guest (no account needed) and open the link again — or use Search › Bid Packages and look up the project number shown above.
The bid package lists the plans, special provisions, items, addenda and questions and answers. Bidding needs PennDOT prequalification and an ECMS business partner account; bids are submitted electronically before the let time (US Eastern).