In plain English
PennDOT is seeking bids to resurface and reconstruct about 7.5 miles of US 422 in Butler County, including milling, drainage work, joint repairs, and paving. The project is in Clearfield, Summit, and Muddy Creek townships, with completion required by October 15, 2027. Bids are due electronically through ECMS on December 3, 2026, at 11:00 a.m.; only prequalified bidders may submit.
About this bid
This project is the roadway resurfacing to include milling of existing bituminous material, minor drainage, transverse and longitudinal joint repair and paving of bituminous leveling and wearing courses and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 422, SECTION 206, in Butler COUNTY in Clearfield, Summit, and Muddy Creek TOWNSHIPS from approximately along US 422 from near the intersection of SR 1015 (Game Reserve Road) at segment 0530 offset 2205 continuing East to the Butler/Armstrong County line (.3 miles east of Graham Road) at segment 0630 offset 1479. ECMS project 117334, bid package 1 (Standard). Short…
Details
- Classification (PSC)
- Highway construction — Highway reconstruction
- Place of performance
- Clearfield, Pennsylvania
How to access this bid
Click “View the original posting” — it opens this bid package in PennDOT's ECMS.
If ECMS shows its home page instead, click the link to enter ECMS as a guest (no account needed) and open the link again — or use Search › Bid Packages and look up the project number shown above.
The bid package lists the plans, special provisions, items, addenda and questions and answers. Bidding needs PennDOT prequalification and an ECMS business partner account; bids are submitted electronically before the let time (US Eastern).

