In plain English
The City of Weslaco is seeking a contractor to replace the power generator system at Fire Station 3. Work may include a natural-gas generator, automatic transfer switch, load bank, electrical connections, concrete pad work, testing, and cleanup. Questions are due November 10, 2026; the final scope and equipment requirements are in the technical specifications and drawings.
About this bid
GENERAL DESCRIPTION The project generally consists of replacing the existing power generator system at City of Weslaco Fire Station 3. Based on the engineer-provided estimate and drawings, work may include electrical demolition; furnishing and installing a new natural-gas generator and automatic transfer switch (ATS); furnishing and installing a load bank; new electrical feeder/conductors and associated connections; saw cutting, patching, painting, and sealing; concrete pad work; testing, commissioning, and site cleanup. The complete scope, equipment ratings, installation requirements, and all inclusions/exclusions shall be as stated in the engineer’s final technical specifications and…
Details
- Agency
- City of Weslaco
- Place of performance
- Texas
How to access this bid
Click “View the original posting” — it opens this solicitation on BidNet Direct, where the agency posted it.
The title and dates are public; sign in with a free BidNet Direct vendor account to see the full notice, documents and addenda.
Submit your response through BidNet Direct (or as the notice directs) before the closing date.
New to this kind of bid?
Read the plain-English guide: what the agency wants, the key dates, and how to put together a competitive response.



