In plain English
The Air Force wants a contractor to dismantle and remove one Quintus ABB fluid cell press from Building 140 at Robins Air Force Base in Georgia. The work includes rigging and moving components to an on-base cutting site, cutting them into recyclable sizes, and hauling the scrap and debris off base. The listed components weigh up to 148,000 pounds; see the Performance Work Statement for details.
About this bid
The Contractor shall provide to the Maintenance Support Group (MXSG) all the tools, parts, materials, equipment, labor, and transportation necessary to decommission, remove, and dispose of one (1) Quintus ABB QFC 1.6 x 4-1400 fluid cell press. The equipment is located in building 140 at Robins Air Force Base (AFB), Georgia. Decommissioning services shall include dismantling, rigging, relocating the components to a designated on-base cutting site, reduction of major components to recyclable sizes, and hauling all resulting scrap and debris off Robins AFB. Upper Filler Piece: 64,000 lbs; Pressure Plate: 32,000 lbs; Lower Filler Piece: 86,000 lbs; Unwound Main Cylinder: 148,000 lbs; Plating…
Details
- Solicitation number
- 82247
- Agency
- DEPT OF DEFENSE
- Notice type
- Sources Sought
- Place of performance
- Warner Robins, Georgia
How to access this bid
Click “View the original posting” to open the opportunity on the portal.
First click may land you on the portal’s homepage — just click it again and it goes straight to the bid.
You may need a free account to view documents — and for plenty of bids you won’t.

