In plain English
The City of Bentonville is seeking qualified construction firms for construction manager at risk services on roadway improvements in Bentonville, Arkansas. The work covers roadways, roundabouts, drainage, utilities, traffic, and corridor improvements across several project areas. The selected firm will provide early design and preconstruction support; construction may be authorized later. Firms will be selected based on qualifications, with interviews possible.
About this bid
The City of Bentonville, Arkansas (“City”) is accepting Statements of Qualifications (“SOQs”) from properly qualified, experienced, and appropriately licensed construction firms interested in providing Construction Manager at Risk (“CMAR”) services for the East Battlefield & Adjacent Areas Roadway Improvements Project . The Project generally includes roadway, roundabout, drainage, utility, traffic, and corridor improvements along East Battlefield Boulevard, East Central Avenue, SE Moberly Lane, Water Tower Road, and selected adjacent roadway connections in Bentonville, Arkansas. The Project is currently organized into multiple improvement packages. The City intends to engage the selected…
Details
- Agency
- City of Bentonville
- Classification (PSC)
- Sewer and Drainage Construction/Rehabilitation; Street and Road Construction Services; Traffic Engineering/Design; Civil Construction; Construction Engineering; General Contractor, Remodeling, Renovation
- Place of performance
- Arkansas
How to access this bid
Click “View the original posting” — it opens this solicitation’s page on the agency’s Beacon portal (beaconbid.com). Viewing is public — no sign-in needed.
Review the description, attachment list, deadlines, and the buyer contact on that page.
To download the documents, join the interest list, or submit an electronic response, create a free Beacon supplier account and respond before the due date.
Documents
Listed on the original posting. Download them from the agency's portal.
- 2026-10-15 CMAR Attachment D-Concept Exhibits.pdf
- 2026-10-16 CMAR Attachment A-Project Location Ma.pdf
- 2026-10-16 WPM RFQ for CMAR.pdf




