In plain English
Replace the 125-ton air-cooled chiller and dedicated chilled-water pump at Trident Technical College’s Palmer Campus in Charleston, South Carolina. The construction cost range is $500,000 to $600,000, and prime contractors need a Building BD license.
About this bid
This work includes but is not limited to the replacement of the 125-ton air cooled chiller and dedicated chilled water pump. Solicitation number: H59-N401-JR. Project location: TTC Palmer Campus 66 Columbus St. Charleston, SC 29403. Construction cost range: $500,000 to $600,000. Delivery method: Design-Bid-Build. Prime contractor license: Building BD. Point of contact: Frank Smith; Director of Engineering & Construction ([email protected]). Full details and documents: A/E Digital Printing, 517 King St STE 1, Charleston, SC 29403
Details
- Agency
- Trident Technical College
- Classification (PSC)
- Construction
- Place of performance
- South Carolina
How to access this bid
Click “View the original posting” — it opens this ad in the South Carolina Business Opportunities (SCBO) Online Edition.
The ad names the buying agency and where the full solicitation is posted (its “Full Details / Download” or “Documents May Be Obtained From” entry) — viewing is public, no account needed.
Get the documents there and respond exactly as the solicitation directs before the deadline.

