Renewable Water Resources is seeking bids to install and modify force mains, add control valves and flow meters, install two influent pumps, and complete related electrical, controls, and site work for the Georges Creek WRRF equalization upgrade. The equalization basin is being built under a separate contract. The project has federal SRF funding requirements, including Davis-Bacon, Build America, Buy America, and opportunities for disadvantaged business firms. A WP license is required, and a pre-bid meeting is scheduled for October 7, 2026, at 6:00 AM.
About this bid
The project consists of installing new force main and modifying existing force main to divert flow from the influent pump station to an equalization basin, installing associated control valves and flow meters, installing 2 new influent pumps for additional pumping capacity, installing associated electrical and instrumentation and controls components, and associated site work. The equalization basin is being constructed under a separate contract (Division I). Funding through the State Revolving Fund (SRF) in South Carolina will be used to fund all or part of this project. As a result, the project will be subject to federal contracting requirements associated with the funding. In anticipation…
Details
- Agency
- Purchasing
- Classification (PSC)
- General Construction - Architectural; Building Construction Services, New; Building Construction, Non-Residential; Construction Services, General; Construction Services, Heavy; Construction Services, Trade; Construction Consulting; Construction Management Services
- Place of performance
- Greenville, South Carolina
How to access this bid
Click “View the original posting” — it opens this bid on the agency’s PlanetBids portal, where the scope, dates and document list are public.
PlanetBids may ask you to complete a quick “confirm you are human” check before the page loads.
To download the documents, receive addenda and bid electronically, register a free PlanetBids vendor account with this agency, then submit before the due date.
Documents
Listed on the original posting. Download them from the agency's portal.
- Georges Creek EQ Upgrade Division II RFB