In plain English
The City of Frontenac is seeking bids to remove and replace the Spoede Road Bridge over Deer Creek, including related roadwork, sidewalks, fencing, and erosion control. Bids are due November 2, 2026, at 10:00 a.m. Contractors must be on MoDOT’s Qualified Contractor List, and a 5% bid bond or certified or cashier’s check is required. The project has a 0% DBE goal and does not allow second-tier subcontracting.
About this bid
Date Issued: 9/15/2026 Sealed BIDS for Spoede Road Bridge Replacement will be received at: to City of Frontenac, 10555 Clayton Rd, St. Louis, MO 63131 until 10:00 o’clock AM (prevailing local time) on 02 day of November, 2026 , and at that time will be publicly opened and read. The proposed work includes: Removals, clearing and grubbing, grading, excavation, bridge construction, asphalt pavement, pedestrian decorative fence, guardrail, rock blanket, pavement markings, concrete sidewalk, seeding and mulching, erosion control, and other miscellaneous work necessary to remove and replace the Spoede Road Bridge over Deer Creek. All labor used in the construction of this public improvement shall…
Details
- Agency
- Bartlett & West, Inc
- Place of performance
- Frontenac, Missouri
How to access this bid
Click “View the original posting” — it opens this project in the plan room, where the bid date, owner contact and invitation to bid are public.
Register a plan room account to download plans, specifications and addenda (or order printed sets); registering also puts you on the plan holders list.
Submit your bid to the owner exactly as the invitation to bid directs, before the bid date.


