In plain English
Westlands Water District seeks a design consultant and general contractor team for design-build work on Phase 1 of the Los Gatos Recharge Basin. A mandatory pre-bid meeting is scheduled for October 15, 2026, at 10:00 AM. Solicitation 26-05 is posted on PlanetBids, where vendors can register for free to download documents and submit bids.
About this bid
Westlands Water District (District) is issuing a Request for Proposal (RFP) to select a qualified design consultant / general contractor team for the Design-Build of Phase 1 of the Los Gatos Recharge Basin. Department: Resources. Mandatory pre-bid meeting: October 15, 2026 at 10:00 AM. Solicitation 26-05 posted by Westlands Water District on PlanetBids. Documents, addenda and electronic bidding are on the PlanetBids listing (free vendor registration to download and respond).
Details
- Agency
- Resources
- NAICS
- 221310 · Water Supply and Irrigation Systems
- Classification (PSC)
- Water Supply and Irrigation Systems; Commercial and Institutional Building Construction; Water and Sewer Line and Related Structures Construction; Other Heavy and Civil Engineering Construction; Site Preparation Contractors; Architectural Services; Landscape Architectural Services; Engineering Services
- Place of performance
- Fresno, California
How to access this bid
Click “View the original posting” — it opens this bid on the agency’s PlanetBids portal, where the scope, dates and document list are public.
PlanetBids may ask you to complete a quick “confirm you are human” check before the page loads.
To download the documents, receive addenda and bid electronically, register a free PlanetBids vendor account with this agency, then submit before the due date.
Documents
Listed on the original posting. Download them from the agency's portal.
- RFP 26-05 Los Gatos Recharge Basin - Phase 1 - Design Build





