In plain English
The City of Runaway Bay wants improvements at the Jim Walters and Port O’Call South lift stations. Work includes adding duplex pumps and controls, repairing wet wells and access roads, replacing piping and valves, upgrading alarms and electrical service, and adding generator connections, lighting, fencing, signage, and telemetry reconnections. Freese and Nichols posted the opportunity on the city’s behalf, with plans and bidding managed through CivCast.
About this bid
The project includes rehabilitation and capacity improvements to the Jim Walters and Port O’ Call South Lift Stations to provide duplex pumping capability and improve reliability. Work generally includes wet well cleaning, concrete repairs and coatings, installation of a second submersible pump with guide rails, replacement of discharge piping, and new check and isolation valves at both stations. Site improvements include access road repairs, fencing, and lift station identification signage. Electrical work includes new duplex pump control panels and local audible and visual alarms associated with the added pumps. Both lift stations include a manual transfer switch and portable generator…
Details
- Agency
- The City of Runaway Bay
- Classification (PSC)
- Lift Station Rehabilitation
- Place of performance
- Texas
How to access this bid
Click “View the original posting” — it opens this project on CivCast, where the owner/engineer manages plans, addenda, and bidding (viewing is public).
Register a free CivCast account to download plans and specs and get on the planholders list — addenda notices come through CivCast.
Submit your bid as the project directs before the bid date — some projects take e-bids on CivCast, others open bids at the owner's office.
Documents
Listed on the original posting. Download them from the agency's portal.
- 3 plan/spec documents on CivCast

