Opportunity timeline
In plain English
Georgia DOT wants a Construction Manager/General Contractor for preconstruction and construction services to replace the US 19/SR 9 bridge over CSX Railroad #639817J in Fulton County. The replacement will stay on the existing alignment, span the CSX tracks and Atlanta Beltline trail, and allow for a possible future track expansion. The contract will use a one-phase best-value process; see the RFP for details.
About this opportunity
Georgia DOT is seeking to contract with a Construction Manager/General Contractor to provide preconstruction and construction services for the replacement of the US 19/SR 9 Bridge over CSX Railroad #639817J along its existing alignment to meet current design standards, while spanning the existing CSX tracks and the Atlanta Beltline trail and accommodating a proposed future track expansion beneath the structure in Fulton County, Georgia (the Project). This Project will be awarded to a Construction Manager/General Contractor utilizing a One-Phase Best Value method. See the RFP for additional details. Point of contact: Elise Snider ([email protected]). Event PE-48401-RFP-2027-000000626 on…
Time remaining
Closes Nov 19, 2026
Related Opportunities

Refrigeration Service for LDC at Fort Stewart, GA

Facility Assessment

Facility Condition Assessment

Fire Alarm Maintenance and Inspection

Bid No. 27003-2001, Union Park Pavilion Phase II
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-4D9541

