In plain English
Georgia DOT wants a Construction Manager/General Contractor for preconstruction and construction services to replace the US 19/SR 9 bridge over CSX Railroad #639817J in Fulton County. The replacement will stay on the existing alignment, span the CSX tracks and Atlanta Beltline trail, and allow for a possible future track expansion. The contract will use a one-phase best-value process; see the RFP for details.
About this bid
Georgia DOT is seeking to contract with a Construction Manager/General Contractor to provide preconstruction and construction services for the replacement of the US 19/SR 9 Bridge over CSX Railroad #639817J along its existing alignment to meet current design standards, while spanning the existing CSX tracks and the Atlanta Beltline trail and accommodating a proposed future track expansion beneath the structure in Fulton County, Georgia (the Project). This Project will be awarded to a Construction Manager/General Contractor utilizing a One-Phase Best Value method. See the RFP for additional details. Point of contact: Elise Snider ([email protected]). Event PE-48401-RFP-2027-000000626 on…
Details
- Agency
- Department of Transportation-2
- Classification (PSC)
- Services / Special Projects; Boring, Drilling, Testing, and Soundings Services, Including Concrete Coring; Testing Services; Geotechnical - Soils; Engineering Services, Non-Licensed (Not Otherwise Classified), Including Consulting; Design Services; Architectural Services, Non-Licensed (Not Otherwise Classified)
- Place of performance
- Georgia
How to access this bid
Click “View the original posting” — it opens this solicitation on the Georgia Procurement Registry (GPR).
Viewing the posting and its document list is public — no account needed.
Some Georgia events route documents and responses to an external “Event Link” (Team Georgia Marketplace); otherwise submit as the posting directs — before the deadline.
Documents
Listed on the original posting. Download them from the agency's portal.
- 0016476_SR9_US19_RFP_Notification_for_GPR.docx
New to this kind of bid?
Read the plain-English guide: what the agency wants, the key dates, and how to put together a competitive response.
