In plain English
The Brazos River Authority wants sealed proposals for major upgrades and expansion of its East Williamson County Regional Water System Water Treatment Plant. The work includes Trinity Well improvements to treat up to 4 million gallons per day and a Phase 1D expansion to treat up to 13 million additional gallons per day, plus storage, pumping, chemical, electrical, automation, and access-road improvements. The estimated value is $216 million. Solicitation 26-1392 is posted on the Texas Electronic State Business Daily; contact Bryan Gray at [email protected].
About this bid
The BRA is soliciting sealed proposals for the EWCRWS Infrastructure and Expansion The “1B1D PROJECT” represents two critical expansion improvements to the Brazos River Authority’s (BRA) East Williamson County’s Regional Water System Water Treatment Plant (EWCWTP); Phase 1B and Phase 1D. The Phase 1B Trinity Well Infrastructure Improvements will use cooling towers to treat up to 4 MGD of groundwater from the existing Trinity Well #1 for blending with treated surface water from Granger Lake. Trinity Well #1 is located on the campus of the EWCWTP. Additionally, Phase 1B work located at the EWCWTP includes significant chemical monitoring and distribution systems, stormwater system, upgrades to…
Details
- Agency
- Brazos River Authority
- Classification (PSC)
- Buildings And Structures: Fabricated And Prefabricated; Building Construction Services, New (Incl. Maintenance And Repair Services); C.I.P., Preconstruction Services; Facilities and Other Improvements; Construction Services, General (Incl. Maintenance And Repair Services); Construction Services, Hazardous Waste (Incl. Site Management)
- Place of performance
- Texas
How to access this bid
Click “View the original posting” — it opens this solicitation on the Texas Electronic State Business Daily (ESBD).
Viewing the posting and its document list is public — no account needed.
Submit your response as the posting directs before the deadline.
Documents
Listed on the original posting. Download them from the agency's portal.
- ESBD_545166_1785800787830_RFP No. 26-1392 EWCRWS 1B1D Projects_final.pdf
- ESBD_545166_1785800787830_2_VOL1_1B Specs-v2 Updated.pdf
- ESBD_545166_1785800787830_3_VOL2_1D Specs-v2 Updated.pdf
- ESBD_545166_1785800787830_Attachment 1_1B1D_DWGS-v1_reduced.pdf
- ESBD_545166_1785800787830_TXDOT Files July 2026.pdf
- ESBD_545166_1786721811232_Addendum No. 1_RFP 26-1392_modify schedule.pdf
- ESBD_545166_1787088288474_PreProposal MTG RFP 26-1392_Aug18_10AM.pdf
- ESBD_545166_1787088289279_PreProposal MTG RFP 26-1392_Aug18_1PM.pdf
- ESBD_545166_1788366382299_Addendum No. 6 RFP 26-1392 1B1D Projects_Add Site Visits_Q&A.pdf
- ESBD_545166_1788366583473_PreProposal MTG RFP 26-1392_Aug20_10AM.pdf
- ESBD_545166_1788366737021_PreProposal MTG RFP 26-1392_Aug20_1PM.pdf
- ESBD_545166_1789763875161_Addendum No. 7 RFP 26-1392_Replace clarifier specs.pdf
- ESBD_545166_1791229950880_Addendum No. 8 RFP 26-1392 1B1D Projects_AddSTP_11.04_QandA2.pdf
- ESBD_545166_1791229950880_Addendum No. 9 RFP 26-1392 1B1D Projects_QandA3_topost.pdf
- ESBD_545166_1792002938570_Excel Cost Form RFP 26-1392_Addendum10.xlsx
- ESBD_545166_1792002939095_Addendum No. 10 RFP 26-1392_Add9Index_ExcelCostForm.pdf
- ESBD_545166_1793051182136_Addendum No. 11 RFP 26-1392 final.pdf
- ESBD_545166_1793376108019_Addendum No. 12 RFP 26-1392 final.pdf


