Bid guide
How to bid on King County’s Shoreline Transfer Station Dust Control Project
What King County is buying
King County is seeking a contractor to install a new dust control system at the Shoreline Transfer Station under construction solicitation KC001711.
The work includes a steel mezzanine partition wall, misting-system modifications, a supply fan tied into existing controls, duct hood demolition and duct capping, HVAC testing and balancing in the office area, and air-barrier repairs. The contract documents may include other work.
Key date and closing
The listed deadline is October 20, 2026, at 4:30 PM ET. Submit your response through the King County Oracle procurement portal before that time.
The plain-English description says it does not state a bid deadline, so check the solicitation documents and portal for the controlling close date and submission details.
Who this opportunity may suit
This construction opportunity may suit a contractor with experience coordinating building-system work, including metal partition installation, misting systems, ventilation and controls, HVAC testing and balancing, and air-barrier repairs.
The description does not state eligibility requirements. Review the full solicitation documents to determine whether your firm can meet the stated requirements.
How to review and respond
Open the negotiation’s public abstract on the King County Oracle procurement portal using the “View original source” option. Viewing is public and does not require sign-in; allow the page time to load. Review the summary, lines, and listed documents. If the portal shows the abstracts list, search for KC001711.
To download documents or submit a response, register a free supplier account on the portal and submit before the close date. The listed point of contact is Leeann Snyder at [email protected].
Prepare a clear construction response
Read the contract documents closely and map each listed work item to your proposed approach, schedule, and responsible team members. Pay particular attention to how the misting system, ventilation changes, existing controls, testing and commissioning, and HVAC balancing fit together.
Check that your response addresses every requested form and submission instruction. Confirm that files are complete and uploaded successfully before the portal closes.
See the live bid — deadline, agency details, and how to respond
Dates and requirements can change via addenda; always verify on the bid page and at the original source before responding.
View this bid on BiddingSimpleThis guide was prepared by BiddingSimple from the solicitation’s public posting. It is not official guidance from King County, WA; the original posting controls.