Bid guide
How to bid on the Christman Field repave for Colorado State University
What Colorado State University is buying
Colorado State University Construction is seeking qualified contractors for airfield repaving at the Christman Field taxiway and hangar area in Colorado. Work includes removing existing asphalt and concrete, excavation and embankment, subgrade reconditioning, aggregate base course, asphalt pavement, electrical work, signage, striping, and traffic control.
The solicitation requires compliance with Davis-Bacon prevailing wage and Buy America Build America requirements. Review the specifications for more information.
Key dates and the bid deadline
Questions are due November 11, 2026. The solicitation deadline is November 19, 2026, at 2:00 PM ET.
Submit your response through BidNet Direct, or as the notice directs, before the closing time. Do not wait until the deadline to complete portal steps or upload your response.
Who this opportunity may suit
This opportunity may suit construction contractors with relevant airfield paving experience and the ability to address the listed pavement, electrical, signage, striping, and traffic-control work.
Firms should be prepared to meet the stated prevailing wage and Buy America Build America requirements.
How to access and respond
Click “View original source” to open the solicitation on BidNet Direct. The title and dates are public; sign in with a free BidNet Direct vendor account to view the full notice, documents, and addenda.
Submit your response through BidNet Direct, or follow the submission directions in the notice, before November 19, 2026, at 2:00 PM ET.
Prepare a clear, complete response
Read the specifications and all addenda before preparing your bid. Map your proposed work and pricing to the listed items, including pavement removal, subgrade preparation, paving, electrical work, signage, striping, and traffic control.
Check that your response addresses the stated Davis-Bacon and Buy America Build America requirements. Ask questions through the process described in the notice by November 11, and leave time to verify that your submission is complete.
See the live bid — deadline, agency details, and how to respond
Dates and requirements can change via addenda; always verify on the bid page and at the original source before responding.
View this bid on BiddingSimpleThis guide was prepared by BiddingSimple from the solicitation’s public posting. It is not official guidance from Colorado State University Construction; the original posting controls.